Author: avoest

Krapohl-Wirth Consulting Company

GIFA Southeast Asia 2025

GIFA Southeast Asia 2025

17th – 19th September 2025 German Pavilion, booth G27 BITEC – Bangkok International Trade & Exhibition Centre Bangkok, Thailand

GIFA MEA – Metal & Steel Egypt 2025

GIFA MEA – Metal & Steel Egypt 2025

6th – 8th September 2025 Booth A 31, Hall 1 EIEC – Egypt International Exhibition Center Cairo, Egypt

IFEX 2025 Messe Indien

IFEX 2025

9th – 11th February 2025 booth E 43 hall B Expo Centre Biswa Bangla Mela Prangan  Calcutta – West Bengal, India

GIFA 2023 12.-16. Juni 2023

GIFA 2023

12th – 16th June 2023 Hall 13, Booth B34 Fairground Dusseldorf Dusseldorf Germany

Innovations in Die Casting – Aalen Foundry Colloquium 2023

4th – 5th May 2023 Aalen, Germany Participant: Dipl.-Ing. MBA Andreas SindelCompany: Krapohl-Wirth Foundry Consulting GmbH

Euroguss 2022

Euroguss 2022

8th – 10th June 2022 Hall 9 / Booth 637 Fair Centre Nuremberg Nuremberg, Germany

Decarbonization – CO2 Neutrality

28th-29th September 2021, Iron Melting Conference & Exhibition 2021, Saarbrücken Cupola furnace dismantling, heat recovery, CO2 minimization – the journey is the goal! Lecture by Mr Andreas Nissen (plant management, company M.Busch GmbH & Co. KG Bestwig) of a Feasibility Study elaborated by company Krapohl-Wirth Foundry Consulting GmbH

Litmash 2021

8th – 10th June 2021 Hall 3 / Booth 3M29  Expocentr Krasnaya Presnya Moscow, Russia

Mashine Set-Up Times: Unused Capacity and Cost Reserves

Mashine Set-Up Times: Unused Capacity and Cost Reserves (Dr. Hans-Peter Krapohl)   Installation works at a die casting installation for E-mobility parts with already set-up die casting mould. Set-up times can be decreased relatively easy by approx. 60 %, according to Mr Dr. Krapohl. PICTURE: WARREN RICHARDSON   Machine set-up times are still neglected. They …

Tree donation to the Bergwaldprojekt e.V.

As a “thank you” for the 10-year trustful cooperation with Krapohl-Wirth Foundry Consulting GmbH, Commerzbank AG made a tree donation to the Bergwaldprojekt eV, which provides a square meter of forest (English oak, hornbeam, etc.) in Oberursel/Taunus to stabilize the forest ecosystem. Würzburg, February 17, 21

Call Now Button